
Torna alla lista
Caposile | barbell bridge
Musile di Piave VE
Ottieni indicazioni
The outrigger bridge connect the two Piave vecchia shores. This work was relized in the 1927 and it had been used till the 1957.
The outrigger bridge connect the two Piave vecchia shores. This work was relized in the 1927 and it had been used till the 1957.